Project:
|
 |
Wendover Medical Center
|
Location:
|
|
Greensboro, NC |
Completed:
|
|
May 2011 |
Scope of Work:
|
|
Multi-level concrete parking structure was showing signs of concrete distress, sealant failure, and was in need of other ongoing maintenance. Provided new sealants and polyurethane deck coating (45K SF) to three levels. Major repairs to concrete beams required shoring, demo, sand blasting, cathodic protection, carbon reinforcement, epoxy injection, etc. Performed other incidental sealant and concrete repairs as well. In addition, replaced two hollow metal doors with all new hardware and metal stair tower(s) repairs included concrete replacement, metal pan replacement, and metal pan reinforcement. |
|
 |
 |
Project:
|
 |
Piedmont Triad International Airport Authority – Enplaning Drive
|
Location:
|
|
Greensboro, NC |
Completed:
|
|
February 2004 |
Scope of Work:
|
|
Elevated concrete slab repair consisted of intensive traffic control, removal of a failed polyurethane deck coating, establishing a non-skid wearing surface via scarifying, control joint sealant replacement, expansion joint replacement, surface repairs followed by the application of a water repellent. |
|
|