Project:
|
 |
Bank of America Stadium (Phases I-IV)
|
Location:
|
|
Charlotte, NC |
Completed:
|
|
Phase I July 2007
Phase II July 2008
Phase III July 2009
Phase IVA June 2010
Phase IVB February 2011
|
Scope of Work:
|
|
Multi-phase façade restoration consisting of complete removal and replacement of joint sealants, elastomeric ledge coatings, precast/concrete spall repairs, preventative maintenance through water repellent application and architectural appearance enhancement through the use of high quality stain. Access accomplished with the use of manlifts. |
|
 |
 |
Project:
|
 |
Wake Forest University – Health Sciences – CSB Rooftop Repairs
|
Location:
|
|
Winston-Salem, NC |
Completed:
|
|
March, 2008 |
Scope of Work:
|
|
Hi-rise medical building was showing signs of water infiltration due to sealant failure and in need of ongoing maintenance. Repairs consisted of new sealants at curtain wall system and sky-lights. All metal to glass and metal to metal joints were replaced. This project was unique because of the difficulty in accessing the areas in order to perform the repairs. The sky-lights were built into the metal roof which was at about a 60 degree pitch and was 12 stories in the air. The repairs were performed off of a built in ladder system that spanned the sky-lights. The curtain wall repairs were performed from a swing stage, but custom tie-backs had to be designed, fabricated and installed on the built in rolling ladder system. |
|
 |
 |
Project:
|
 |
Green Valley Office Building
|
Location:
|
|
Greensboro, NC |
Completed:
|
|
August, 2003 |
Scope of Work:
|
|
Multi-story maintenance project contracted to mitigate excessive calcium silicate window deposits. Scope of work included intensive glass restoration using proprietary mineral deposit remover and protecting precast concrete façade with topically applied high performance silane based water repellent. Access accomplished utilizing manlifts. |
|
|